N.H. Code Admin. R. Env-A 1803.03

Current through Register No. 25, June 20, 2024
Section Env-A 1803.03 - Required Records

After the project is complete, each O/O of a facility where an asbestos abatement project has occurred shall record and maintain the following information, in electronic or paper format, for each project:

(a) The name, title, and address of each supervisor and worker who participated in the project;
(b) The address of the project;
(c) The work plan for the project;
(d) All notifications and revisions submitted to the department pursuant to Env-A 1804;
(e) Waste shipment records and disposal site slips for all RACM taken from the project site;
(f) The estimated amount of RACM involved in the project;
(g) The scheduled and actual starting and completion dates and, if an actual date differs from the date originally scheduled, a statement of reasons for the difference(s);
(h) Documentation of compliance with all applicable requirements of this chapter;
(i) Copies of all asbestos-related correspondence with the department and other state and federal agencies concerning the project, including but not limited to building or demolition permits, notices of violation, or other documents relating to permits;
(j) The name and address of the asbestos disposal facility to which the RACM was taken;
(k) The methodology and results of all air sampling, including clearance testing, conducted during the abatement process, the name and address of any consultant hired to perform such sampling, and the name and address of any analytical service employed to analyze such samples; and
(l) Descriptions of worksite accidents and unplanned or planned exposures to asbestos.

N.H. Code Admin. R. Env-A 1803.03

(See Revision Note at chapter heading for Env-A 1800) #9298, eff 10-21-08

Amended by Volume XXXVII Number 19, Filed May 11, 2017, Proposed by #12172, Effective 5/5/2017, Expires 5/5/2027.