N.H. Admin. Code § En 509.10

Current through Register No. 36, September 5, 2024
Section En 509.10 - E-24 Report of Gas Meter Complaint Tests
(a) Each utility shall file department "Form E-24, Report of Gas Meter Complaint Tests," dated October 2023 monthly with the department.
(b) Form E-24 shall include the following:
(1) The name of the utility filing the report;
(2) The name and address of the customer making the complaint;
(3) The meter manufacturer; manufacturer's number; company number; type and size of meter;
(4) The percent registrations which are fast or slow;
(5) The period of refund or collection; and
(6) The signature, full name, and title of the utility employee who supervised the preparation of the report, and date of signature.

N.H. Admin. Code § En 509.10

Derived from Number 45, Filed November 9, 2023, Proposed by #13796, Effective 10/25/2023, Expires 10/25/2033.