N.H. Admin. Code § En 402.19

Current through Register No. 52, December 26, 2024
Section En 402.19 - Significant facility disruption

"Significant facility disruption" means an outage of facilities owned, operated, leased, or otherwise utilized by a telephone utility that is at least 30 minutes in duration and that:

(a) Potentially affects at least 900,000 user minutes;
(b) Affects at least 1,350 DS3 minutes;
(c) Potentially affects any special offices and facilities listed in 47 C.F.R. § 4.5(b); or
(d) Potentially affects a 911 special facility as defined in 47 C.F.R.§ 4.5(e).

N.H. Admin. Code § En 402.19

Derived from Number 28, Filed July 11, 2024, Proposed by #14015, Effective 7/1/2024, Expires7/1/2034 (see Revision Note at chapter heading for En 400).