Nev. Admin. Code § 704.9395

Current through August 29, 2024
Section 704.9395 - Resource plan: Information on financial and economic characteristics of planned facilities

A utility's resource plan must contain information on the financial and economic characteristics of planned facilities. The information must include:

1. The estimated costs of construction, including:
(a) Annual flows of expenditures with allowance for money expended during construction; and
(b) Annual flows of expenditures without allowance for money expended during construction;
2. The estimated costs of operation, including:
(a) Variable costs per kilowatt-hour, with expenses for fuel and other items indicated separately; and
(b) Fixed costs per kilowatt-hour;
3. Net environmental costs and net economic benefits to the State;
4. The rates of escalation of cost, including:
(a) Capital costs;
(b) Variable fuel costs;
(c) Nonfuel operating costs;
(d) Environmental costs; and
(e) Fixed operating costs; and
5. The average cost per kilowatt-hour at projected loads in current dollars for each year of the plan for each existing and planned facility.

Nev. Admin. Code § 704.9395

Added to NAC by Pub. Service Comm'n, eff. 6-7-84; A 2-18-88; 3-27-92; A by Pub. Utilities Comm'n by R004-04, 5-25-2004

NRS 703.025, 704.210, 704.741