Section 618.505 - Notice of construction project; meetings between Chief of Enforcement Section and general contractor or owner of construction project1. The general contractor or owner, if there is no general contractor, of a construction project shall, before commencing construction on the project, give written notice to the Chief which sets forth the height, square footage, type of construction, total cost of construction and location of the project.2. After receiving notice pursuant to subsection 1, the Chief or a person designated by the Chief may require one or more meetings with the general contractor or owner. The Chief or the person so designated may require the general contractor or owner to provide at any such meeting: (a) A copy of: (1) The written safety program for each contractor on the construction project; and(2) The general plans related to the project that are prepared by an engineer or architect and are available at the time of the meeting. The general plans may be requested only to evaluate and comment on the safety of the workplace at the construction project.(b) The names of the following persons working on the construction project:(1) The project manager or construction superintendent; and(2) The designated safety officer.Nev. Admin. Code § 618.505
Added to NAC by Div. of Industrial Relations, eff. 5-18-94