Nev. Admin. Code § 538.660

Current through December 12, 2024
Section 538.660 - Losses
1. Losses for the system will be determined for each contractor by the Commission and will be set out in exhibits to each contract or in a separate agreement.
2. Losses may be accounted for by determining the contractor's load at its meters and then increasing that load by an assigned factor for losses, back to the contractual point of delivery or by using other methods agreed to by the Commission and the contractor.
3. The assigned factor for losses will be reviewed periodically by the Commission and may be increased or decreased if it is determined to be necessary to meet actual losses.

Nev. Admin. Code § 538.660

Added to NAC by Colorado River Comm'n, eff. 9-13-85; A 12-17-87

NRS 538.181, 538.201