Nev. Admin. Code § 538.620

Current through November 25, 2024
Section 538.620 - Scheduling and accounting procedures; delivery of power
1. The Commission, in cooperation with the contractor, will establish scheduling, accounting and delivery procedures for the receipt of power from the Commission that meet the needs of the contractor. These procedures must be set forth in an agreement approved by the Executive Director of the Commission.
2. Deliveries of power from the Boulder Canyon Project, Parker-Davis Project or Salt Lake City Area Integrated Projects will be scheduled by the Commission in advance in accordance with the procedures set forth in separate scheduling instructions which will provide for schedules to meet the needs of day-to-day or hour-by-hour operations. The instructions must include procedures for determining amounts of power from the Boulder Canyon Project, Parker-Davis Project and Salt Lake City Area Integrated Projects delivered to the contractor at each point of delivery and procedures for delivery of losses. The procedures must also specify the conditions under which actual deliveries, which are greater or less than scheduled deliveries during the month of a particular season, will be adjusted in later deliveries in subsequent months of that season.

Nev. Admin. Code § 538.620

Added to NAC by Colorado River Comm'n, eff. 9-13-85; A 12-17-87; R123-00, 2-15-2001; A by R148-13, eff. 6/23/2014

NRS 538.181, 538.201