Except as otherwise provided in this section, if, for 3 consecutive operating years, a contractor does not use the full allocation of power made available to it by the Commission, the Commission, after notifying the contractor, may reduce its allocation to that contractor to the extent of the contractor's failure to use that full allocation. A reduction will not be made if the contractor's failure to use that full allocation is caused by the implementation of a program for integrated resource planning or a similar program, however designated, described in NAC 538.530 and approved for the contractor by Western or the Commission.
Nev. Admin. Code § 538.560
NRS 538.181, 538.201