All energy from the Boulder Canyon Project designated in Schedule C at 43 U.S.C. § 619 a(a)(1)(C) and any additional power from the Parker-Davis Project or Salt Lake City Area Integrated Projects offered to the Commission may be accepted by the Executive Director of the Commission on behalf of the Commission and will be offered by the Executive Director of the Commission on behalf of the Commission at the time those resources become available and in the most equitable manner as determined by the Executive Director of the Commission, first, to entities that hold contracts for hydroelectric power from the Commission, and then, to any other entity to which the Commission is authorized by law to sell electricity. All entities must observe whatever restrictions are placed on that power.
Nev. Admin. Code § 538.480
NRS 538.181, 538.201