Nev. Admin. Code § 538.430

Current through December 12, 2024
Section 538.430 - Transmission of power for delivery beyond designated points of delivery

The transmission of power, including costs and losses, for delivery of power beyond the Commission's designated points of delivery are the responsibility of the contractor.

Nev. Admin. Code § 538.430

Added to NAC by Colorado River Comm'n, eff. 9-13-85

NRS 538.181, 538.201