"Schedule C" means the schedule appearing at 43 U.S.C. § 619 a(a)(1)(C) which specifies the priority of entitlement of the states of Arizona, California and Nevada to excess energy generated at the Hoover power plant.
Nev. Admin. Code § 538.385
NRS 538.181, 538.201