Nev. Admin. Code § 538.375

Current through December 12, 2024
Section 538.375 - "Schedule A" defined

"Schedule A" means the schedule appearing at 43 U.S.C. § 619 a(a)(1)(A) which specifies the amount of:

1. Contingent capacity of the Hoover power plant; and
2. Associated firm energy, allocated in that schedule.

Nev. Admin. Code § 538.375

Added to NAC by Colorado River Comm'n, by R148-13, eff. 6/23/2014

NRS 538.181, 538.201