Current through December 31, 2024
Section 534A.205 - Location of well: Survey required; filing of certified plat of location1. Except as otherwise provided in subsection 3, the location of an individual geothermal well or the geothermal wells in a project area must be surveyed by a professional land surveyor who is licensed pursuant to chapter 625 of NRS.2. Except as otherwise provided in subsection 3, a certified plat of the location must be filed with the Division within 30 days after the completion of the construction of the well. The plat must: (a) Be of a standard size;(b) Show the location of any designated lots; and(c) Contain a description of the location of the proposed well:(1) Within a 40-acre legal subdivision; or(2) Which includes an accurate course and distance tied to an established corner of a section or quarter section and a full description of the corner to which the tie is made, together with all markings thereon.3. The provisions of this section do not apply to a thermal gradient well.Nev. Admin. Code § 534A.205
Added to NAC by Comm'n on Mineral Resources, eff. 12-16-92; A by R057-15, eff. 12/21/2015