Nev. Admin. Code § 534A.480

Current through November 8, 2024
Section 534A.480 - Abandonment of thermal gradient or observational well

For abandonment of a thermal gradient well, the following provisions apply:

1. If the well was drilled and no water was encountered, the well bore must be backfilled with cuttings and a cement plug 50 feet long must be placed at the top of the well.
2. If the well encountered water when drilled, the well bore must be filled with a material approved by the Division and a cement plug of 50 lineal feet must be placed at the top of the well.
3. The surface must be restored as near as practicable to its original condition.

Nev. Admin. Code § 534A.480

Added to NAC by Comm'n on Mineral Resources, eff. 11-12-85; A by R057-15, eff. 12/21/2015; A by R032-19A, eff. 12/16/2019
NRS 513.063, 534A.090