The operator shall, as soon as weather and ground conditions permit, upon final abandonment and completion of the plugging of any well, clear the area around the well of all refuse, drain and fill all excavations, remove concrete bases, machinery and materials, and level the surface to leave the site as close to its condition when operations were commenced as practicable.
Nev. Admin. Code § 522.455