Current through December 12, 2024
Section 459.95425 - Pre-start-up safety review1. The owner or operator of a facility with a process that is subject to C.A.P.P. shall perform a pre-start-up safety review for new facilities and for modified facilities when the modification is significant enough to require a change in the process safety information.2. A pre-start-up safety review must confirm that before a highly hazardous substance or explosive is introduced into a process: (a) Construction and equipment is in accordance with design specifications;(b) Safety, operating, maintenance and emergency procedures are in place and are adequate;(c) For new or modified facilities, a process hazard analysis has been performed and recommendations have been resolved or implemented before start-up;(d) Modified facilities meet the requirements concerning the management of changes set forth in NAC 459.95423; and(e) Training of each employee involved in operating and maintaining the process has been completed.Nev. Admin. Code § 459.95425
Added to NAC by Environmental Comm'n by R121-98, eff. 5-27-99; A by R137-04, 2-15-2005