The discharge of safety valves, blowoff pipes and other outlets of a boiler or pressure vessel must be full sized to the point of discharge and be piped to a safe point of discharge.
Nev. Admin. Code § 455C.236
Added to NAC by Div. of Industrial Relations by R101-02, eff. 12-15-2004
NRS 455C.110