Nev. Admin. Code § 455C.112

Current through December 31, 2024
Section 455C.112 - Prerequisites to operation of new boiler or pressure vessel

A new boiler or pressure vessel must not be operated in this State unless:

1. The owner of the boiler or pressure vessel has complied with the requirements for an operating permit set forth in NAC 455C.140; and
2. The boiler or pressure vessel is designed, constructed, inspected, stamped and installed in accordance with the code.

Nev. Admin. Code § 455C.112

Added to NAC by Div. of Industrial Relations by R101-02, eff. 12-15-2004

NRS 455C.110