Nev. Admin. Code § 455.145

Current through December 12, 2024
Section 455.145 - Restrictions upon and duties of excavator before commencement of excavation or demolition

Except when commencing an emergency excavation as provided in the provisions of subsection 2 of NRS 455.110, an excavator:

1. Shall not commence an excavation or demolition until each operator of a subsurface installation within the affected area of the proposed excavation or demolition has marked the location or has provided the approximate location of the subsurface installations of the operator pursuant to the provisions of NAC 455.125.
2. To ensure that all subsurface installations in the affected area have been properly located and identified, shall not commence an excavation or demolition until the excavator has reviewed:
(a) All marks made by operators pursuant to the provisions of NAC 455.125;
(b) All marks made by the excavator pursuant to the provisions of NAC 455.115;
(c) All other information regarding subsurface installations provided to the excavator by an operator with subsurface installations in the affected area of the proposed excavation or demolition;
(d) All other evidence that is visible of the approximate location of subsurface installations in the affected area of the proposed excavation or demolition; and
(e) The electronic notification sent by the association for operators to be excavated pursuant to subsection 2 of NAC 455.120.

Nev. Admin. Code § 455.145

Added to NAC by Pub. Utilities Comm'n by R156-03, eff. 8-25-2004; A by R115-24A, eff. 9/16/2024

NRS 455.137, 703.025, 704.260, 704.280