Nev. Admin. Code § 449.179

Current through October 11, 2024
Section 449.179 - Submission and approval of plan for new construction or remodeling; inspection; evidence of compliance
1. Except for a residential facility with less than 11 beds, before a residential facility is constructed or an existing facility is remodeled, the facility must:
(a) Submit the plan for construction or remodeling to the entity designated to review such plans by the Division pursuant to the provisions of NAC 449.0115;
(b) Notify the Bureau of a tentative date for the completion of the construction or remodeling; and
(c) Obtain approval of the plan from the Division.
2. The plan for construction or remodeling must include a description of the materials that will be used to complete the project.
3. Before issuing a license to operate a residential facility, the Bureau shall inspect the facility to ensure that it complies with:
(a) The provisions of NAC 449.156 to 449.27706, inclusive; and
(b) The applicable zoning ordinances and regulations.
4. An applicant for a license to operate a residential facility must submit to the Bureau with his or her application evidence that the applicant and the facility are in compliance with the provisions of NRS 449.001 to 449.240, inclusive, and NAC 449.156 to 449.27706, inclusive.
5. The Bureau shall not perform the inspection required pursuant to subsection 3 until the applicant has submitted to the Bureau the application required pursuant to NRS 449.040, the fee required pursuant to NAC 449.016 and the evidence required pursuant to subsection 4.

Nev. Admin. Code § 449.179

Added to NAC by Bd. of Health by R003-97, eff. 10-30-97; A by R076-01, 10-18-2001; R071-04, 8-4-2004; R118-05, 11-17-2005

NRS 449.0302