Current through October 11, 2024
Section 449.520 - New construction or remodeling: Notification; increase in number of stations for which facility is licensed1. A facility shall notify the Bureau in writing at least 30 days before beginning any construction, renovation or modification of the physical plant of the facility.2. A facility must obtain the approval of the Bureau before increasing the number of stations for which the facility is licensed. If a facility intends to increase the number of those stations, the facility must, at least 30 days before the proposed date to increase the number of stations, submit to the Bureau an application for a new license. The application must be submitted on a form approved by the Bureau and include: (a) Evidence satisfactory to the Bureau that: (1) The facility has reviewed the availability of the members of the staff of the facility and, if necessary, has increased the number of positions on the staff to accommodate the proposed increase in the number of stations; and(2) The water treatment system of the facility is sufficient to ensure the availability of water that is safe for the proposed increase in the number of stations; and3. If a facility submits an application pursuant to the provisions of this section, the Bureau may, before considering the application, conduct an inspection of the facility to determine compliance with those provisions.4. If the Bureau approves an application pursuant to the provisions of this section, the facility shall, not later than 21 days after commencing the use of the stations for which the application was approved, submit to the Bureau a written report concerning the chemical analysis and bacteriologic cultures of the product water of the stations. The written report must be prepared and submitted in accordance with the provisions of the most recently published edition of the American National Standard, Water Treatment Equipment for Hemodialysis Applications, which is hereby adopted by reference. A copy of the publication may be obtained from the Association for the Advancement of Medical Instrumentation, 1110 North Glebe Road, Suite 220, Arlington, Virginia 22201, for the price of $45 for members and $90 for nonmembers.Nev. Admin. Code § 449.520
Added to NAC by Bd. of Health by R130-99, eff. 8-1-2001; A by R075-04, 8-5-2004