"Projected daily sewage flow" means the peak quantity of sewage a facility is estimated to produce on a daily basis and upon which the sizing and design of the on-site sewage disposal system is based.
Nev. Admin. Code § 445A.9564
NRS 445A.425
"Projected daily sewage flow" means the peak quantity of sewage a facility is estimated to produce on a daily basis and upon which the sizing and design of the on-site sewage disposal system is based.
Nev. Admin. Code § 445A.9564
NRS 445A.425