Current through December 31, 2024
Section 444.645 - Program for quality assurance and control for construction of required liner systemThe owner or operator of a municipal solid waste landfill unit shall:
1. Develop and carry out a program for quality assurance and quality control for the construction of all liner systems required by NAC 444.681; and2. Submit a summary of this program to the solid waste management authority before waste may be placed in the municipal solid waste landfill unit.Nev. Admin. Code § 444.645
Added to NAC by Environmental Comm'n, eff. 11-8-93