Current through November 8, 2024
Section 444.9485 - Requirements for permit to operate or construct facility; requirements for permitted facility1. Any facility to be constructed for the treatment, storage or disposal of waste containing polychlorinated biphenyl must have a permit before commencement of construction. The application for the permit must comply with the following sections of 40 C.F.R. Part 270 :(b) Section 270.13, except for subsections (c), (f) and (j);(c) Section 270.14, except for subsections (a), (b)(2), (b)(6), (b)(9), (b)(11)(v), (b)(14), (b)(18) and (c)(1);(d) Section 270.15, except for subsections (c) and (d) and any reference to drainage systems in § 264.175;2. An application for a permit to operate or construct a facility for the treatment, storage or disposal of waste containing polychlorinated biphenyl must contain:(a) A specification and an estimate of the annual quantity of the waste containing polychlorinated biphenyl to be treated, stored or disposed of at the facility, designated by code number;(b) A description of the procedures and equipment required for the security of the facility;(c) A copy of the schedule for inspection;(d) A copy of the contingency plan;(e) A copy of the plan for the introductory and continuing training of personnel at the facility;(f) Proof of financial responsibility to ensure compliance with conditions of the permit as these requirements are specified in 40 C.F.R. §§ 264.140 to 264.148, inclusive; and(g) A copy of the plan for closure of the facility.3. A generator of polychlorinated biphenyl who stores his or her own waste for less than 9 months or in quantities of less than 1,000 kilograms is not required to obtain a permit under this section.4. The owner or operator of a permitted facility for the management of waste containing polychlorinated biphenyl shall comply with the conditions specified in 40 C.F.R. § 270.30.Nev. Admin. Code § 444.9485
Added to NAC by Environmental Comm'n, eff. 6-29-84; A 9-19-90