Nev. Admin. Code § 349.345

Current through November 8, 2024
Section 349.345 - Procedure after tentative approval of project

If after a public hearing the Board tentatively approves a proposed water project, the Board may, depending on the size and scope of the project:

1. Grant final approval of the application by adopting a resolution containing the findings set forth in NAC 349.350 or, if the application was filed by a municipal obligor, as set forth in NAC 349.425, and direct the Department to proceed with financing; or
2. If required, direct the applicant to proceed with the preparation of final plans, specifications and contract documents for submission to the Board for its subsequent review and final approval.

Nev. Admin. Code § 349.345

Added to NAC by Dep't of Commerce, eff. 4-22-88; A 11-13-90