The Administrator shall review the preliminary plans of a project and the accompanying report submitted pursuant to NAC 341.351 and determine the high performance building design measures that must be incorporated into the design of the project to ensure that the project will achieve the efficiencies in the use of energy and water set forth in NAC 341.346. In reaching this determination, the Administrator shall consider, in addition to the information provided by the design consultant or project manager pursuant to NAC 341.351:
Nev. Admin. Code § 341.356
NRS 341.091, 341.110