Nev. Admin. Code § 232.Sec. 4

Current through November 8, 2024
Section 232.Sec. 4 - NEW

"Carson River corridor" includes, without limitation, the 100-year floodplain of the Carson River, land adjacent to the 100-year floodplain of the Carson River, sloughs or ponds of the Carson River, old meanders and oxbows of the Carson River and any tributary of the Carson River within its recognized hydrographic basins.

Nev. Admin. Code § 232.Sec. 4

Added to NAC by Rehabilitation Div. by R025-22A, eff. 9/8/2022

Sections 2 and 3 of Assembly Bill No. 84, chapter 480, Statutes of Nevada 2019, at pages 2861 and 2864