Current through September 17, 2024
Section 412-3-002 - PERMITS FOR THE OCCUPANCY OF HIGHWAYS BY UNDERGROUND PIPES OR CONDUITS002.01 Any person desiring to occupy any portion of a highway with an underground pipe line or conduit will apply to the Department for a permit to so occupy.002.02 All applications for permits will be made on the form prepared and furnished by the Department.002.03 Applications may be made to the Department of Transportation. Box 94759. Lincoln. Nebraska 68509-4759.002.04 All applications for a permit will show the full name and address of the applicant and will set forth the type of use that is desired by the applicant that is. whether it Is to be a crossing or a parallel occupancy of the highway.002.05 The applicant will submit a plan or sketch showing in detail the type and the nature of the pipe or conduit the length of the pipe or conduit, and the depth at which the pipe or conduit will be installed beneath the highway surface. The plan or sketch will set forth the number and surface type of the highway and the exact locations of the portions of the highway to be occupied with respect to land lines and civil subdivisions.002.06 The applicant will be required to backfill all excavated trenches in thin layers and will compact the replaced material until its density is equal to at least that of the surrounding earth. No "mounding over" of the trench will be permitted.002.07 The Department may mandate the pipes or conduits to be installed in casings.412 Neb. Admin. Code, ch. 3, § 002
Adopted effective 11/25/2019Amended effective 12/7/2019