285 Neb. Admin. Code, ch. 2, § 003

Current through September 17, 2024
Section 285-2-003

Any electric supplier may construct or acquire a line not to exceed one-half mile in length without Board approval; PROVIDED THAT, the supplier obtains written consent of all owners of electric lines located within one-half mile of the proposed extension and files said consents with the Board. (Applications shall be filed with the consents.) If the space provided in the application is not sufficient for the information, additional sheets should be attached and referred to in the appropriate space provided.

285 Neb. Admin. Code, ch. 2, § 003

ENABLING LEGISLATION:84-909, 70-1006, 70-1011, and 70-1012, R. R, S. 1943.