Whenever operations cease for a period of sixty (60) days on any well, the operator shall give notice to the Commission of the change to inactive status.
* The type of well.
* The bottom hole assembly.
* Pressures as measured by gauge for:
* Tubing.
* Production casing annulus.
* Surface casing annulus.
* Static fluid level as measured from ground level.
* Method used to determine static fluid level.
* Date data was obtained.
* Information stating if any formations with reservoir pressures high enough to initiate flow into the lowermost freshwater aquifer exist.
A yearly fee will be collected for each well that is inactive for two or more consecutive years. The operator will submit a fee for each well requested for inactive status. The fee structure is as follows:
Inactive Period, Year(s) | Fee |
0 to 2 | $ 0/Year |
2 or more | $200/Year |
The funds shall be used at the discretion of the Commission and the collection of fees may be reduced to five dollars ($ 5.00) per well at the discretion of the Director if previously collected funds prove sufficient to carry out the purposes of the Well Plugging and Abandonment Trust Fund.
267 Neb. Admin. Code, ch. 3, § 040
Statute: 57-905; 57-906; 57-907; 57-908; 57-919; 57-923