Sub-surface pressure tests, as may be required by the Commission, shall be reported on Form 9A within twenty (20) days after completion of tests.
267 Neb. Admin. Code, ch. 3, § 010
Sub-surface pressure tests, as may be required by the Commission, shall be reported on Form 9A within twenty (20) days after completion of tests.
267 Neb. Admin. Code, ch. 3, § 010