The owner of a dam shall file with the Department a completion certification after completion of the removal, breach, or abandonment of the dam. The completion certification shall be made on a form provided by the Department accompanied by supplementary drawing or descriptive matter, signed and sealed by the engineer responsible for the work, showing or describing the work as actually completed. The drawings or descriptive matter shall substantially conform to the requirements for plans and specifications in Chapter 4 of these regulations.
458 Neb. Admin. Code, ch. 10, § 002