159 Neb. Admin. Code, ch. 6, § 006

Current through September 17, 2024
Section 159-6-006 - PERIODIC TESTING OF SPILL PREVENTION EQUIPMENT AND CONTAINMENT SUMPS USED FOR INTERSTITIAL MONITORING OF PIPING AND PERIODIC INSPECTION OF OVERFILL PREVENTION EQUIPMENT

The requirements of 40 CFR 280.35 as it existed on July 15, 2015 are adopted and incorporated by reference.

006.01 If a ball float is to be abandoned in place, a drop tube shut off or audible alarm will be set at 85 percent tank capacity to prevent overfill.

159 Neb. Admin. Code, ch. 6, § 006