Current through September 17, 2024
Sampling shall occur as set out in the sampling and analysis plan approved by the Department, and the results reported to the Department within 45 days of the sampling event. The following information shall be obtained:
005.01 Depth to water prior to purging and sampling; and005.02 Sample and lab analyses for nitrate, chloride, and ammonia, at a minimum, using accepted lab methods and sampling techniques. 005.02A Sampling shall be conducted by a qualified person, as defined by the Nebraska Health and Human Services System.005.02B A sampling and analysis plan, or some other standardized plan for sampling and analysis of the ground water samples, shall be submitted and approved as part of the ground water monitoring plan.130 Neb. Admin. Code, ch. 13, § 005