Any source approved for coverage under a permit-by-rule will be considered to have fulfilled the owner or operator's duty to obtain a construction permit under this Title, unless required to do so elsewhere under this Title or the Act. Compliance with the permit-by-rule, will take precedence over requirements of previously issued construction permits applicable solely to the approved source, except for provisions in Sections 002.01 and 002.02.
002.01 The permit-by-rule provisions of this chapter may not supersede more stringent requirements which are contained in previously issued construction permits, unless, subject to Department approval, a site specific technical demonstration is submitted which shows that these more stringent requirements are unnecessary to protect the NAAQS or PSD increment.002.02 The permit-by-rule provisions of this chapter may not supersede requirements to limit a source's potential to emit which are contained in previously issued construction permits, unless the owner or operator can demonstrate that there was no applicable regulation in effect or condition to limit the source's potential to emit in the previously issued construction permits.129 Neb. Admin. Code, ch. 8, § 002
Amended effective 6/24/2019Amended effective 9/28/2022