Current through September 17, 2024
Following the close of the public comment period and any public hearing, the Director may issue a general permit.
006.01 For a general operating permit, the Director will include: 006.01A All applicable requirements pertinent to Class I operating permits, if the source category includes Class I sources; or006.01B All applicable requirements pertinent to Class II operating permits, if the source category includes Class II sources.006.02 For a general construction permit, the Director will include any stationary source or emission unit such that there is a net increase in potential emissions at the stationary source equal to or exceeding the levels identified in Chapter 3.129 Neb. Admin. Code, ch. 7, § 006
Amended effective 9/28/2022