128 Neb. Admin. Code, ch. 1, § 047

Current through September 17, 2024
Section 128-1-047 - EPA

"EPA" means the United States Environmental Protection Agency.

047.01 A continuous on-site, physical construction program has begun; or
047.02 The owner or operator has entered into contractual obligations, which cannot be canceled or modified without substantial loss, for physical construction of the facility to be completed within a reasonable time.

128 Neb. Admin. Code, ch. 1, § 047

Amended effective 7/6/2016.