Current through September 17, 2024
Section 126-2-019 - Filing for Renewal; Expiring Permits019.01 The Director shall notify the permittee that if he wishes to continue to operate after the expiration date of his waste management permit, he must file for reissuance of his permit at least one-hundred eighty (180) days prior to its expiration.019.02 A renewal application shall consist of the same information required in the original waste management permit application, which may consist of a recertification of the original application, unless the Department requires additional information.019.03 Prior to renewal, the permittee shall be in compliance with or have complied with all the terms, conditions, requirements, and schedules of compliance of the expiring permit.019.04 Public notice and public participation procedures for renewal of the permit shall be those procedures specified for permits in paragraph 017 of this Chapter.126 Neb. Admin. Code, ch. 2, § 019