Current through September 17, 2024
One of the following two methods will be used for closure of a septic tank or holding tank:
002.01 Pump and Fill Method: The tank will be pumped of all liquids and solids and then filled with soil or sand. If soil is used it will be tamped completely so as to prevent voids which would occur as the result of settling; or002.02 Pump and Remove Method: The tank will be removed after being pumped of all liquids and solids and the void left from the tank removal will be filled in with soil. The soil or sand will be mounded to provide for future settling.124 Neb. Admin. Code, ch. 7, § 002
Amended effective 6/27/2022