Rapid infiltration cells will operate in a two-phase cycle of wastewater application followed by a drying period that is sufficient to restore aerobic conditions to the soil. The application period will not exceed seven days unless written permission is obtained from the Department.
123 Neb. Admin. Code, ch. 11, § 009