Any injection or mineral production well required to have a permit under this title is prohibited until the permit has been issued with final construction design as approved by the Director.
122 Neb. Admin. Code, ch. 3, § 002
Any injection or mineral production well required to have a permit under this title is prohibited until the permit has been issued with final construction design as approved by the Director.
122 Neb. Admin. Code, ch. 3, § 002