Notice of Intent to Operate Prior to operation of a Class I or III injection well(s) and/or mineral production well(s), the permittee must submit a notice of completion construction to the Director and provide the following information as required by the permit to obtain approval to operate:
004.01 All available logging and testing program data on the well(s);004.02 A demonstration of mechanical integrity pursuant to Chapter 18 of this Title;004.03 The results of the formation testing program;004.04 The compatibility of injected materials with fluids in the injection zone and minerals in both the injection zone and the confining zone; and004.05 The status of corrective action on defective wells in the area of review.122 Neb. Admin. Code, ch. 19, § 004