Mont. Admin. r. 36.15.903

Current through Register Vol. 23, December 6, 2024
Rule 36.15.903 - FLOOD PROOFING REQUIREMENTS FOR PLUMBING SYSTEMS
(1) Plumbing systems for allowed and permitted floodplain and floodway uses shall conform to the following conditions:
(a) Sewer lines, except those to buried and sealed vaults, must have check valves installed to prevent sewage backup into permitted structures; and
(b) All toilet stools, sinks, urinals, and drains must be located such that the lowest point of possible water entry is at least 2 feet above the elevation of the base flood.

Mont. Admin. r. 36.15.903

NEW, Eff. 9/4/74; AMD, 1989 MAR p. 1665, Eff. 10/27/89.

Sec. 76-5-208, MCA; IMP, Sec. 76-5-401 through 76-5-402, and Sec. 76-5-404 through 76-5-406, MCA;