Current through Register Vol. 23, December 6, 2024
Rule 36.11.223 - CONTROL OF SLASH AND DEBRIS(1) Slash, including slash generated by right-of-way clearing, road construction and maintenance, must be reduced to meet the general standard for 90% of the total area within each cutting unit. No single area greater than two acres or 10% of the cutting unit area, whichever is less, may exceed the general standard.(2) The cutting unit must meet the general standard within 100 feet of: (a) the perimeter of a cutting unit;(b) all roads with legal public access that pass though or are adjacent to the cutting unit; and(c) active railroad right-of-ways.(3) At least 90% of the slash piles generated by forest practices activity must be burned in areas where the general standard applies.(4) All slash piles within 100 feet of a public road, cutting unit or property boundary, or active railroad right-of-way must be burned, except as provided in ARM 36.11.224 through 36.11.230.Mont. Admin. r. 36.11.223
NEW, 2000 MAR p. 2526, Eff. 9/22/00.76-13-403, MCA; IMP, 76-13-403 and 76-13-407, MCA;