Current through Register Vol. 23, December 6, 2024
Rule 17.50.1806 - TENORM WASTE MANAGEMENT SYSTEM LICENSE AND APPLICATION REQUIREMENTS(1) A person may not construct, expand, or operate a TENORM waste management system after [the effective date of this rule] without first obtaining a TENORM waste management system license from the department in compliance with ARM Title 17, chapter 50, subchapters 4 and 5 and this subchapter.(2) An applicant for a TENORM waste management system license shall use the application form provided by the department. In addition to the information required under ARM 17.50.508, the applicant shall provide the following information: (a) a document signed by the landowner that grants access to the property to the department, private contractors, and the waste management system owner/operator to perform activities associated with regulation and operation of the TENORM waste management system;(b) technical design specifications;(d) a detailed site plan that includes: (i) information concerning any material that will be used to construct a liner or berm, including but not limited to: (A) type, quantity, and source of waste to be accepted;(E) liner construction quality assurance and quality control (QA/QC) plans;(ii) design and location of any proposed storage or treatment areas;(iii) design and location of any liquid containment or storage structures;(iv) design, location, and grades of any surface water diversion and drainage structures;(e) an operation and maintenance plan that complies with [17.50.1808 ];(f) a ground water monitoring plan that complies with [17.50.1811 ]; and(g) a closure plan and a post-closure care plan that complies with [17.50.1812 ].Mont. Admin. r. 17.50.1806
NEW, 2020 MAR p. 1118, Eff. 6/27/2020AUTH: 75-10-204, MCA; IMP: 75-10-204, 75-10-221, MCA