Mont. Admin. r. 17.20.1606

Current through Register Vol. 24, December 20, 2024
Rule 17.20.1606 - LINEAR FACILITIES, NEED STANDARD
(1) In order to find that there is a need for an electric transmission facility To establish the basis of need, as required by 75-20-301, MCA, the department must find that the services of the facility are needed by finding and determining and determine at least one of the following:
(a) the facility is a connecting link based on an explanation of how this facility would augment the existing system;
(b) the facility has been designated as a "common carrier" under 69-13-101, MCA;
(c) the facility has been identified to relieve a constraint or capacity issue between an energy resource, generation project, market or load center. The constraint or capacity issue(s) are based on existing, projected load or generation;
(d) the facility would resolve system reliability or stability issues;
(e) the facility would fulfill a requirement or recommendation of a federal, state, local, or other governmental regulatory body, or is recommended through an independent system operator or regional transmission organization planning process or objective;
(f) the facility is necessary to correct an existing or potential safety hazard;
(g) the facility is necessary to correct existing deficiencies to the existing network and explain how the facility would improve the existing network;
(h) the facility has been identified in economic studies to reduce total costs to ratepayers or customers; or
(i) the facility would provide firm energy transfer capacity in a path that currently does not exist.

Mont. Admin. r. 17.20.1606

NEW, 1984 MAR p. 1844, Eff. 12/28/84; TRANS, from DNRC, 1996 MAR p. 2863; AMD, 2005 MAR p. 252, Eff. 2/11/05; AMD, 2024 MAR p. 1879, Eff. 7/27/2024

AUTH: 75-20-105, MCA; IMP: 75-20-301, MCA