Mo. Code Regs. tit. 2 § 90-60.050

Current through Register Vol. 49, No. 21, November 1, 2024.
Section 2 CSR 90-60.050 - Use of Missouri Coordinate System of 1983

PURPOSE: This rule sets forth the requirements for referencing land boundary corners to the Missouri Coordinate System of 1983.

(1) When the professional land surveyor is specifically requested or required to reference land boundary corners to the Missouri Coordinate System of 1983, the professional land surveyor shall comply with the following requirements:
(A) The position of the corner shall be based upon a geodetic control station having a horizontal accuracy of second order (as defined in 20 CSR 2030-18.020 ) or higher order;
(B) The survey connecting the corner to the geodetic control station shall meet the accuracy standards for property boundary surveys set forth in this chapter; and
(C) The plat or other publication of results shall identify the geodetic control station(s) that were used to determine the position of the corner(s), along with a list of the coordinates of those control station(s); the appropriate adjustment date or realization designation on the North American Datum of 1983, along with the epoch date when applicable; a brief statement of the method used to obtain those positions; and the grid factor used.

2 CSR 90-60.050

Adopted by Missouri Register May 1, 2017/Volume 42, Number 09, effective 6/30/2017