Mo. Code Regs. tit. 10 § 25-7.270

Current through Register Vol. 49, No.12, June 17, 2024
Section 10 CSR 25-7.270 - Missouri Administered Permit Programs: The Hazardous Waste Permit Program

PURPOSE: All of the rules in Title 10, Division 25 relating to hazardous waste generators, permitted hazardous waste facilities, and hazardous waste transporters were reviewed as part of the department's Red Tape Reduction initiative for the purpose of reducing regulations that unnecessarily burden individuals and businesses while doing little to protect or improve public health and safety and our natural resources. The purpose of this amendment is to make changes consistent with this initiative to this rule.

(1) The regulations set forth in 40 CFR part 270, July 1, 2013, except for the changes made at 70 FR 53453 September 8, 2005, and 73 FR 64667 to 73 FR 64788, October 30, 2008, as published by the Office of the Federal Register, National Archives and Records Administration, Superintendent of Documents, Pittsburgh, PA 15250-7954, are incorporated by reference. This rule does not incorporate any subsequent amendments or additions. Except as provided otherwise in this rule, the substitution of terms set forth in 10 CSR 25-3.260(1)(A) shall apply in this rule in addition to any other modifications set forth in section (2) of this rule. Where conflicting rules exist in 10 CSR 25, the more stringent rules control.
(A) Any federal agency, administrator, regulation, or statute that is referenced in 40 CFR part 270 is deleted and the comparable state department, director, rule, or statute as provided in 10 CSR 25-3.260(1)(A) is added in its place except as specified in this rule. The additional substitutions or changes noted in this subsection also apply.
(2) The owner or operator of a permitted hazardous waste treatment, storage, or disposal (TSD) facility shall comply with the requirements noted in this rule along with 40 CFR part 270, incorporated in this rule.
(A) General Information. This subsection sets forth requirements which modify or add to those requirements in 40 CFR part 270 subpart A.
1. When a facility is owned by one (1) person but is operated by another person, both the owner and operator shall sign the permit application, and the permit shall be issued to both.
2. The owner or operator of a new hazardous waste management facility shall contact the department and obtain a United States Environmental Protection Agency (EPA) identification number as part of the application process for a hazardous waste treatment, storage, or disposal permit.
3. In 40 CFR 270.3 "Considerations Under Federal Law," do not substitute any comparable Missouri statute or administrative rule for the federal acts and regulations. This does not relieve the owner or operator of his/her responsibility to comply with any applicable and comparable state law or rule in addition to complying with the federal acts and regulations.
(B) Permit Application. This subsection sets forth requirements which modify or add to those requirements in 40 CFR part 270 subpart B.
1. Existing hazardous waste management facilities must submit a Part A permit application to the department no later than sixty (60) days after the effective date of state rules which first require them to comply with the requirements set forth in 10 CSR 25-7.265 or 10 CSR 25-7.266. A facility which did not meet federal notification and Part A submittal requirements under the Hazardous and Solid Waste Amendments (HSWA) does not qualify for state interim status. State interim status is granted to those facilities which either meet federal interim status requirements, are required to meet state interim status requirements because no federal interim status requirements affect the filing, or become subject to regulations under state rules which are not promulgated to meet the requirements of 40 CFR part 271.
2. Confidentiality may be requested for certain permit application information submitted pursuant to 40 CFR 270.13(a)-(m) incorporated in this rule. 10 CSR 25-3.260(1)(B) sets forth requirements for protection of confidential business information and the availability of information provided under 10 CSR 25. Therefore, 40 CFR 270.12 is not incorporated by reference in this rule.
3. All submitted engineering plans and reports shall be approved by a registered professional engineer licensed by Missouri. The engineering plans and reports shall specify the materials, equipment, construction methods, design standards, and specifications for hazardous waste management facilities, and processes that will be utilized in the construction and operation of the facility. The engineering plans and reports shall also include a diagram of any piping, instrumentation, or process flows, and descriptions of any feed systems, safety cutoffs, bypass systems, and pressure controls (for example, vents).
4. The permit application fee set forth in 10 CSR 25-12.010 shall be submitted with the application.
5. The department will supervise any field work undertaken to collect geologic and engineering data which is to be submitted with the application. The applicant shall contact the department at least five (5) working days prior to conducting any field work that is undertaken to collect geologic and engineering data which is to be submitted with the application. A fee shall also be assessed pursuant to 10 CSR 25-12.010 for all costs incurred by the department in the observation of field work, engineering, and geological review of the application, and all other review necessary by the department to verify that the application complies with section 260.395.7., RSMo.
6. The permit application shall include the following information for the purpose of notification:
A. Names and address of all persons listed on the facility mailing list as defined in 10 CSR 25-8.124(1)(A) 10.C.(I)(c) submitted in the form of an alphabetical list with five (5) sets of addressed, self-adhesive mailing labels also included; and
B. The name, address, and telephone number of the location where the permit application and supporting documents are to be placed, as described in 10 CSR 25-8.124(1)(B) 3.B.(II)(c) and the name of the person at that location who may be contacted to schedule a review of the documents.
7. An applicant may be required to submit other information as may be necessary to enable the department to carry out its duties.
8. The owner or operator of a permitted treatment, storage, and disposal (TSD) facility that accepts and/or ships hazardous waste via railroad tank car (railcar) may submit a railcar management plan in accordance with the requirements set forth in 10 CSR 25-7.264(3).
9. The person applying for a permit under sections 260.350- 260.434, RSMo, shall comply with the requirements of 10 CSR 25-8.124(1).
(C) Permit Conditions. This subsection sets forth requirements which modify or add to those requirements in 40 CFR part 270 subpart C.
1. This paragraph sets forth the procedures for issuance of a hazardous waste facility permit, construction certification, and authorization to begin operation.
A. If, after public notice in accordance with 10 CSR 25-8.124 and review of the application, the department determines that the application conforms with the provisions of sections 260.350- 260.434, RSMo, and all standards and rules corresponding, the department shall issue the hazardous waste facility permit to the applicant upon payment of a fee of one thousand dollars ($1000) for each facility for each year the permit is to be in effect beyond the first year.
B. The appeal period for a permit or any condition of a permit begins on the date of issuance of the permit as specified in subparagraph (2)(C)1.A. of this rule. However, for the purposes of termination of interim status pursuant to 40 CFR 270.73(a) incorporated in this rule, final administrative disposition of the permit application occurs either-
(I) Thirty (30) days after issuance of a final permit pursuant to this rule, unless a notice of appeal is filed with the commission within that time;
(II) Thirty (30) days after permit denial pursuant to this rule, unless a notice of appeal is filed with the commission within that time; or
(III) Upon the issuance of a decision by the commission, after timely appeal of an action of this rule.
2. The department may deny the permit application if-
A. The applicant fails to submit a complete application in accordance with, and within the time specified in, a notice of deficiency issued pursuant to 10 CSR 25-8.124(1)(A) 3.;
B. The applicant has failed to fully disclose all relevant information in the application or during the permit issuance process or has misrepresented facts at any time;
C. The department determines that the application does not conform with the provisions of sections 260.350-260.434, RSMo, and all corresponding standards and rules, or that the facility cannot be effectively operated and maintained in full compliance with sections 260.350-260.434, RSMo, and all corresponding standards and rules, or that the facility is being operated or maintained in violation of a present permit, or that continued operation of the facility presents an unreasonable threat to human health or the environment or will create or allow for the continuance of a public nuisance;
D. The department determines that one (1) of the conditions specified in section 260.395.17., RSMo, is present; or
E. The applicant owner or operator fails to submit the permit fees specified in subparagraph (2)(C)1.A. of this rule within thirty (30) days of receipt of notice from the department that the fees are due.
(D) Changes to Permit. (Reserved)
(E) Expiration and Continuation of Permits. (Reserved)
(F) Special Forms of Permits. (Reserved)
(G) Interim Status. This subsection sets forth requirements which modify or add to those requirements in 40 CFR part 270 subpart G.
1. An owner or operator who becomes regulated under 10 CSR 25-7 shall operate in compliance with interim status in accordance with paragraph (2)(B)1. of this rule.
2. In addition to the items in 40 CFR 270.73 incorporated in this rule, interim status terminates when the department issues an order or commences an action pursuant to paragraph (2)(G)4. of this rule requiring the owner or operator to cease operations and undertake closure actions at the facility or at a unit.
3. The owner or operator, at any time, may voluntarily submit a permit application pursuant to this rule.
4. Upon a determination by the department that the facility is not being operated or cannot be operated in full compliance with the requirements of 10 CSR 25-7.265, the department, in lieu of or in addition to requiring the submittal of a permit application pursuant to paragraph (2)(G)1. of this rule, may take an enforcement action pursuant to sections 260.410, 260.420, and 260.425, RSMo, as it deems appropriate under the circumstances in order to fully and effectively protect public health and the environment.

10 CSR 25-7.270

AUTHORITY: section 260.370, RSMo Supp. 2010 and sections 260.390 and 260.395, RSMo 2000.* Original rule filed Dec. 16, 1985, effective 10/1/1986. Amended: Filed Feb. 3, 1987, effective 8/1/1987. Amended: Filed Dec. 1, 1987, effective 8/12/1988. Amended: Filed Feb. 16, 1990, effective 12/31/1990. Amended: Filed Jan. 15, 1991, effective 8/1/1991. Amended: Filed Feb. 14, 1992, effective 12/3/1992. Amended: Filed Jan. 5, 1993, effective 8/9/1993. Amended: Filed June 3, 1993, effective 1/31/1994. Amended: Filed Jan. 5, 1994, effective 8/28/1994. Amended: Filed April 4, 1994, effective 10/30/1994. Amended: Filed Aug. 16, 1995, effective 4/30/1996. Amended: Filed June 1, 1998, effective 1/30/1999. Amended: Filed Feb. 1, 2001, effective 10/30/2001. Amended: Filed March 31, 2006, effective 12/30/2006. Amended: Filed Oct. 15, 2008, effective 6/30/2009. Amended: Filed April 15, 2011, effective 12/30/2011.
Amended by Missouri Register November 2, 2015/Volume 40, Number 21, effective 12/31/2015
Amended by Missouri Register February 1, 2019/Volume 44, Number 3, effective 4/1/2019

*Original authority: 260.370, RSMo 1977, amended 1980, 1988, 1993, 1995, 2004, 2010; 260.390, RSMo 1977, amended 1980, 1983, 1985, 1993; and 260.395, RSMo 1977, amended 1980, 1983, 1985, 1988, 2000.