PURPOSE: This rule establishes a fee structure for activities conducted under 10 CSR 23 pursuant to section 256.623, RSMo.
1. General Test | $50 |
2. Water Well Contractor Test | $50 |
3. Pump Contractor Test | $50 |
4. Heat Pump Contractor Test | $50 |
5. Monitoring Well Contractor Test | $50 |
6. Test Hole Contractor Test | $50 |
7. Retakes (for each test) | $50 |
10 CSR 23-2.010
*Original authority: 256.606, RSMo 1991; 256.614, RSMo 1985, amended 1991; 256.623, RSMo 1985, amended 1991; and 256.626, RSMo 1985, amended 1991.