PURPOSE: This rule defines sources required to obtain permits to construct. It establishes: requirements to be met prior to construction or modification of any sources; a procedure for a source to voluntarily obtain a permit for implementing practically enforceable conditions; a procedure for the permitting authority to issue general permits; permit fees; and public notice requirements for certain permits.
PUBLISHER'S NOTE: The secretary of state has determined that the publication of the entire text of the material which is incorporated by reference as a portion of this rule would be unduly cumbersome or expensive. This material as incorporated by reference in this rule shall be maintained by the agency at its headquarters and shall be made available to the public for inspection and copying at no more than the actual cost of reproduction. This note applies only to the reference material. The entire text of the rule is printed here.
Hg = 2.5H
provided the owner or operator produces evidence that this equation was actually relied on in establishing an emission limitation; and for all other stacks,
Hg = H + 1.5L
Where:
Hg = GEP stack height, measured from the ground-level elevation at the base of the stack;
H = height of nearby structure(s) measured from the ground-level elevation at the base of the stack; and
L = lesser dimension, height, or projected width of the nearby structure(s). Provided that the director may require the use of a field study or fluid model to verify GEP stack height for the installation; or
Permit Application Type | Rule Section Reference | Filing Fee | Processing Fee |
Portable Source Relocation Request | (4) | $300 | ---- |
Minor | (5) | $250 | $75/hr |
General Permit | (6) | $700 | ---- |
New Source Review (NSR) | (7) | $5,000 | $75/hr |
Prevention of Significant Deterioration (PSD) | (8) | $5,000 | $75/hr |
xHAP | (9) | $5,000 | $75/hr |
Initial Plantwide Applicability Limit (PAL) | (7) or (8) | $5,000 | $75/hr |
Renewal PAL | (7) or (8) | $2,500 | $75/hr |
Temporary/Pilot | (10) | $250 | $75/hr |
Permit Amendment | (11) | ---- | $75/hr |
Effective January 1, 2026, permit fees are as follows:
Permit Application Type | Rule Section Reference | Filing Fee | Processing Fee |
Portable Source Relocation Request | (4) | $300 | ---- |
Minor | (5) | $300 | $100/hr |
General Permit | (6) | $700 | ---- |
New Source Review (NSR) | (7) | $6,000 | $100/hr |
Prevention of Significant Deterioration (PSD) | (8) | $6,000 | $100/hr |
xHAP | (9) | $6,000 | $100/hr |
Initial Plantwide Applicability Limit (PAL) | (7) or (8) | $6,000 | $100/hr |
Renewal PAL | (7) or (8) | $3,500 | $100/hr |
Temporary/Pilot | (10) | $250 | $100/hr |
Permit Amendment | (11) | ---- | $100/hr |
Pollutant | Averaging Time | ||||
Annual | 24-hour | 8-hour | 3-hour | 1-hour | |
SO2 | 1.0 | 5 | 25 | 7.9 | |
PM10 | 5 | ||||
PM2.5 | 0.2 | 1.2 | |||
NO2 | 1.0 | 7.5 | |||
CO | 500 | 2000 | |||
Individual HAP Significant Impact Levels are equal to four (4) percent of the respective RALs listed in the table referenced in subparagraph (5)(F)6.A. of this rule. |
Note: All impacts in micrograms per cubic meter.
Pollutant | Maximum Allowable Increase |
Class I Areas Particulate Matter 2.5 Micron: | |
Annual arithmetic mean | 1 |
24-hour maximum | 2 |
Particulate Matter 10 Micron: | |
Annual arithmetic mean | 4 |
24-hour maximum | 8 |
Sulfur Dioxide: | |
Annual arithmetic mean | 2 |
24-hour maximum | 5 |
3-hour maximum | 25 |
Nitrogen Dioxide: | |
Annual arithmetic mean | 2.5 |
Class II Areas | |
Particulate Matter 2.5 Micron: | |
Annual arithmetic mean | 4 |
24-hour maximum | 9 |
Particulate Matter 10 Micron: | |
Annual arithmetic mean | 17 |
24-hour maximum | 30 |
Sulfur Dioxide: | |
Annual arithmetic mean | 20 |
24-hour maximum | 91 |
3-hour maximum | 512 |
Nitrogen Dioxide: | |
Annual arithmetic mean | 25 |
Class III Areas | |
Particulate Matter 2.5 Micron: | |
Annual arithmetic mean | 8 |
24-hour maximum | 18 |
Particulate Matter 10 Micron: | |
Annual arithmetic mean | 34 |
24-hour maximum | 60 |
Sulfur Dioxide: | |
Annual arithmetic mean | 40 |
24-hour maximum | 182 |
3-hour maximum | 700 |
Nitrogen Dioxide: | |
Annual arithmetic mean | 50 |
Notes:
10 CSR 10-6.060